Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
THE_LOCAL_REPORT_ARTICLES_LOGO THE LOCAL REPORT ARTICLES

Trusted Indian news delivering fast, factual, and in-depth coverage of politics, business, society, and stories that truly matter

THE_LOCAL_REPORT_ARTICLES_LOGO THE LOCAL REPORT ARTICLES

Trusted Indian news delivering fast, factual, and in-depth coverage of politics, business, society, and stories that truly matter

  • TRENDING
  • INDIA
  • SPORTS
  • TECH
  • UK
  • WORLD
  • TRENDING
  • INDIA
  • SPORTS
  • TECH
  • UK
  • WORLD
Subscribe
Close

Search

In 1906, five railroad bridges carried coal through West Virginia’s New River Gorge; 120 years later an $11.8 million project is rebuilding them for hikers
TRENDING

In 1906, five railroad bridges carried coal through West Virginia’s New River Gorge; 120 years later an $11.8 million project is rebuilding them for hikers

By WEB DESK TEAM
September 4, 2026 3 Min Read
Comments Off on In 1906, five railroad bridges carried coal through West Virginia’s New River Gorge; 120 years later an $11.8 million project is rebuilding them for hikers
In 1906, five railroad bridges carried coal through West Virginia’s New River Gorge; 120 years later an $11.8 million project is rebuilding them for hikers
The project began on September 1, 2026, with a ceremonial groundbreaking at the Minden Trailhead.

Five railroad bridges built in 1906 to carry coal through West Virginia’s New River Gorge are getting a new purpose more than a century later. An $11.8 million restoration project is now under way to repair the bridges and reopen the historic trail for visitors.According to the National Park Service (NPS), the project began on September 1, 2026, with a ceremonial groundbreaking at the Minden Trailhead. The project is being funded through the Great American Outdoors Act Legacy Restoration Fund. The National Park Foundation and Friends of New River Gorge joined the NPS for the event.The restoration is focused on the Rend Trail, formerly known as the Thurmond-Minden Trail. The 3.2-mile trail runs along the New River and Dunloup Creek and provides views of the historic downtown and community of Thurmond.

Five bridges built for coal trains

The Rend Trail follows an old railroad grade that was built in 1906 to haul coal. Today, the same route is used as a recreational trail and crosses five historic railroad trestles, or bridges.However, more than 100 years of exposure and use have left the wooden structures in poor condition. According to the NPS, structural risks caused by the ageing infrastructure have resulted in partial closures along the trail. One of the main bridges has been closed for several years because it became too unsafe for people to cross.The restoration will remove the existing wooden bridges and replace them with durable aluminium tread, according to Acting Superintendent Eric LaPrice.The project is not limited to the bridges. The NPS said it will also repair key retaining walls and resurface the trail. The path will also be rerouted around Big Rock, where the existing terrain has made access difficult.

Trail to be accessible again

Another major part of the work will focus on making the trail easier to access. The project will regrade the trail, improve drainage and add a restroom at the trailhead.The stairs at Big Rock will also be replaced with an accessible ramp. This is expected to help open the full trail to people of all abilities.The work is intended to restore the Rend Trail as a continuous route. At present, partial closures mean visitors cannot travel through the entire trail.“The trail was partially closed, so it wasn’t a through trail. Now, when this work is done, it’s going to be a through trail again. It’s going to connect to another area of the park and it’s going to connect to the trails that the community has here. So it’s a connection to the community,” LaPrice said.The Thurmond and Minden/Oak Hill trailheads will also be rehabilitated as part of the project. Together, the improvements are intended to address safety problems and reconnect the trail with nearby communities.

16 months to go

The NPS expects the construction work to take about 16 months. The agency hopes to reopen the complete trail with a ribbon-cutting ceremony next fall.The restoration is also expected to support tourism in the surrounding area. The NPS said spending by visitors to the park generated an estimated $95.5 million for the local economy in 2024.The project is being paid for through the Legacy Restoration Fund, which was created under the Great American Outdoors Act. The fund expired in September 2025, and supporters are now seeking its renewal.Paul Coussan, vice president of government relations for the National Park Foundation, said efforts are under way to extend the programme.“We have a lot of support in Congress right now on the America the Beautiful Act, which would take this great program that was created back in 2020, the Legacy Restoration Fund, and extend it for another five years,” Coussan said. “So we’re really working to get that done.”

Tags:

bridgescarriedcoalGorgehikersmillionprojectrailroadrebuildingriverus newsus top newsVirginiasWestyears
Author

WEB DESK TEAM

Our team of more than 15 experienced writers brings diverse perspectives, deep research, and on-the-ground insights to deliver accurate, timely, and engaging stories. From breaking news to in-depth analysis, they are committed to credibility, clarity, and responsible journalism across every category we cover.

Follow Me
Other Articles
Indian-origin father and son's hotel empire in US accused of $100 million loan fraud and ponzi-like scheme
Previous

Indian-origin father and son’s hotel empire in US accused of $100 million loan fraud and ponzi-like scheme

Meet Jonathan Thai, the 17-year-old from Alpharetta, Georgia whose nonprofit raised $30,000, donated 400 bikes and taught 350 children to ride
Next

Meet Jonathan Thai, the 17-year-old from Alpharetta, Georgia whose nonprofit raised $30,000, donated 400 bikes and taught 350 children to ride

  • ABOUT US
  • CONTACT US
  • CORRECTION POLICY
  • Home
  • Privacy Policy
  • TERMS AND CONDITIONS
  • Terms of Use
  • ABOUT US
  • CONTACT US
  • CORRECTION POLICY
  • Home
  • Privacy Policy
  • TERMS AND CONDITIONS
  • Terms of Use
Copyright 2026 — THE LOCAL REPORT ARTICLES. All rights reserved. Blogsy WordPress Theme