Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
THE_LOCAL_REPORT_ARTICLES_LOGO THE LOCAL REPORT ARTICLES

Trusted Indian news delivering fast, factual, and in-depth coverage of politics, business, society, and stories that truly matter

THE_LOCAL_REPORT_ARTICLES_LOGO THE LOCAL REPORT ARTICLES

Trusted Indian news delivering fast, factual, and in-depth coverage of politics, business, society, and stories that truly matter

  • TRENDING
  • INDIA
  • SPORTS
  • TECH
  • UK
  • WORLD
  • TRENDING
  • INDIA
  • SPORTS
  • TECH
  • UK
  • WORLD
Subscribe
Close

Search

TRENDING

Watch: 2 workers make it out alive 9 days after Nepal floods hit hydropower tunnel

By WEB DESK TEAM
September 4, 2026 3 Min Read
Comments Off on Watch: 2 workers make it out alive 9 days after Nepal floods hit hydropower tunnel
Watch: 2 workers make it out alive 9 days after Nepal floods hit hydropower tunnel
The rescue of two workers have revived hope for hundreds of others still said to be trapped

Rescuers in Nepal pulled two workers alive from a tunnel at the Trishuli 3A hydropower project on Friday, nine days after devastating floods and landslides trapped hundreds of workers inside tunnels across several hydropower sites.The rescue brought a dramatic breakthrough to a desperate operation, but hopes of finding more survivors rose further after rescuers heard voices coming from inside the tunnel, according to Bipin Regmi, police chief in the flood-hit district of Nuwakot.“Rescuers heard voices,” Regmi told CNN, adding that a medical team was on its way to the site.The two workers were pulled out in quick succession from inside the Trishuli 3A plant, where rescuers have been boring into a tunnel in an effort to reach 42 workers who had remained unaccounted for.Video showed about a dozen rescuers pulling one man through a small opening in the ground and clapping as he emerged. The mud-covered worker was then carried away on a rescuer’s shoulder, while a medical team checked on him.Nepal Army spokesperson Brig. Gen. Raja Ram Basnet confirmed the first rescue during the operation. Nepal lawmaker Shri Ram Neupane later said a second worker had also been rescued alive.The tunnel leading to the underground powerhouse is more than 4 kilometres (2.5 miles) long. Dozens of workers were inside when the catastrophic flooding hit the area.About 900 workers are missing from 12 hydropower projects in Nepal, according to local authorities, with roughly 500 believed to be trapped inside tunnels. Among those unaccounted for are workers from China, South Korea and India.Read more: Nepal estimates $2.56 billion flood damage, faces $52.6 million recovery costThe rescue effort has continued under treacherous conditions since Aug. 26, when massive floods and landslides tore through parts of Nepal, likely after a glacier collapse. At least 1,259 people have been killed and more than 5,000 remain missing, according to Nepal’s disaster management agency.On the Tibet side of the border, China said late Wednesday that 21 people had been killed and 541 were missing.The chances of finding survivors have become increasingly uncertain with each passing day. Indian Army Colonel Parikshit Mehra, who was involved in the rescue operation at the Trishuli 3A site, said earlier this week that the first 48 hours are the most crucial in a tunnel rescue.“People who are stuck tend to panic much more than when they are outside in the open,” Mehra told CNN’s Anderson Cooper.“Getting stuck in a tunnel you can’t see anything. Generally if you stay in the dark you get disoriented in about 24-25 hours,” he said.“Beyond that, (after) 48 hours, you start hallucinating. And then I think from there on it’s always a fight.”Yet, even as the operation entered its ninth day, Mehra offered a note of hope saying, “There have been miracles.”Also read: Nepal minister goes back on flash flood ‘compensation’ claimThe flash floods, triggered by an ice-rock avalanche near the Nepal-Tibet border on August 26, caused widespread destruction across northern and central Nepal, killing at least 1,282 people and leaving thousands missing. Nepal Police said the highest number of recovered bodies were reported from Chitwan, Nawalparasi East and West, Nuwakot and Rasuwa, with rescue and recovery operations continuing across the affected areas.

What should be prioritized in Nepal’s recovery plan?

3k+ users shared opinion today

5k+ users already voted today

3k+ users shared opinion today

Share Opinion

Tags:

alivedaysfloodshithydropowerNepaltunnelus newsus top newswatchworkers
Author

WEB DESK TEAM

Our team of more than 15 experienced writers brings diverse perspectives, deep research, and on-the-ground insights to deliver accurate, timely, and engaging stories. From breaking news to in-depth analysis, they are committed to credibility, clarity, and responsible journalism across every category we cover.

Follow Me
Other Articles
Thai ice cream founder has put his 27-year-old business up for roughly $6 million after deciding to become a monk
Previous

Thai ice cream founder has put his 27-year-old business up for roughly $6 million after deciding to become a monk

An 1877 New Jersey house has served as a museum since 1924; after 102 years, a $1.5 million restoration is reviving its hidden 19th-century floors and preparing it to reopen
Next

An 1877 New Jersey house has served as a museum since 1924; after 102 years, a $1.5 million restoration is reviving its hidden 19th-century floors and preparing it to reopen

  • ABOUT US
  • CONTACT US
  • CORRECTION POLICY
  • Home
  • Privacy Policy
  • TERMS AND CONDITIONS
  • Terms of Use
  • ABOUT US
  • CONTACT US
  • CORRECTION POLICY
  • Home
  • Privacy Policy
  • TERMS AND CONDITIONS
  • Terms of Use
Copyright 2026 — THE LOCAL REPORT ARTICLES. All rights reserved. Blogsy WordPress Theme